ODS-Dopravní stavby Ostrava
Czechia
- Sections
- 3
- Length
- 19 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| D1 motorway (Praha – Brno – Ostrava – Polish border) / Ostrava-Rudná – Hrušov | Czechia | Opened | 9 km | Dec 2007 | – |
| D1 motorway (Praha – Brno – Ostrava – Polish border) / Hrušov – Vrbice | Czechia | Opened | 4 km | Dec 2007 | – |
| D1 motorway (Praha – Brno – Ostrava – Polish border) / Bohumín – Polish border | Czechia | Opened | 6 km | Nov 2012 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.