← All contractors
Пътища Пловдив АД
Bulgaria
Name variants are not merged
Unregistered spelling
- Sections
- 1
- Length
- 43 km
- Median slip
- +18 mo
- Median overrun
- –
Slip measured on 1 of 1 sections built.
No section this firm built records both an estimate and a final cost.
Too few sections to rank. The figures below describe the work; they are not a track record.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A4 Maritsa Motorway / Chirpan – Haskovo | Bulgaria | Opened | 43 km | Oct 2015 | +18 mo |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.