PBDiM Mińsk Mazowiecki
Poland
- Sections
- 2
- Length
- 36 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A2 motorway (Świecko – Poznań – Łódź – Warszawa – Siedlce – Biała Podlaska – Kukuryki) / Mińsk Mazowiecki bypass (Choszczówka Stojecka – Kałuszyn) | Poland | Opened | 21 km | Aug 2012 | – |
| S8 expressway (Wrocław – Łódź – Warszawa – Białystok) / Marki – Radzymin Południe (Marki bypass) | Poland | Opened | 15 km | Dec 2017 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.