RZD International
Serbia
- Sections
- 2
- Length
- 68 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| Belgrade – Novi Sad – Subotica High-Speed Railway / Stara Pazova – Novi Sad | Serbia | Opened | 40 km | Mar 2022 | – |
| Subotica – Horgoš – Hungarian Border Railway / Subotica – Horgoš – Hungarian border | Serbia | Opened | 28 km | Nov 2023 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.