Shandong Hi-Speed Group Co., Ltd.

Serbia
Sections
2
Length
50 km
Median slip
–
Median overrun
–

No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Sections built

SectionCountryStatusLengthOpenedSlip
A2 Miloš Veliki Motorway (Belgrade – Požega) / Obrenovac – UbSerbiaOpened26 kmJan 2019–
A2 Miloš Veliki Motorway (Belgrade – Požega) / Lajkovac – LjigSerbiaOpened24 kmAug 2019–

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.