← All contractors
SITE
Croatia
- Sections
- 1
- Length
- 33 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Too few sections to rank. The figures below describe the work; they are not a track record.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- Bombardier Transportation Italy – SITE S.p.A.
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| Vinkovci – Vukovar and Vinkovci – Tovarnik railway upgrades / Vinkovci – Tovarnik – state border | Croatia | Opened | 33 km | Jan 2012 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.