Somet S.A.
Romania
Name variants are not merged
Unregistered spelling
- Sections
- 1
- Length
- 8 km
- Median slip
- +8 mo
- Median overrun
- –
Slip measured on 1 of 1 sections built.
No section this firm built records both an estimate and a final cost.
Too few sections to rank. The figures below describe the work; they are not a track record.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- Gülermak Ağır Sanayi İnşaat ve Taahhüt A.Ş. – Somet S.A.
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| Bucharest Metro Line M6 (Gara de Nord – Otopeni Airport) / Phase III: Tokyo – Henri Coandă Airport | Romania | Under construction | 8 km | – | +8 mo |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.