Stecol Corporation
Poland
- Sections
- 3
- Length
- 78 km
- Median slip
- +11 mo
- Median overrun
- –
Slip measured on 1 of 3 sections built.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A2 motorway (Świecko – Poznań – Łódź – Warszawa – Siedlce – Biała Podlaska – Kukuryki) / Groszki – Siedlce Zachód | Poland | Opened | 13 km | Dec 2024 | +11 mo |
| S19 expressway, Via Carpatia (Kuźnica – Białystok – Lublin – Rzeszów – Barwinek) / Sokółka Północ – Czarna Białostocka | Poland | Tendered | 24 km | – | – |
| S19 expressway, Via Carpatia (Kuźnica – Białystok – Lublin – Rzeszów – Barwinek) / Międzyrzec Podlaski – Radzyń Podlaski – Kock | Poland | Under construction | 41 km | – | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.