SUDOP Praha
Czechia
Name variants are not merged
Unregistered spelling
- Sections
- 0
- Length
- 0 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
–
Other roles
Credited to this firm, counted nowhere above.
- D0 Prague Ring Road (Pražský okruh) / Řepy – Ruzyně (517)Designer
- D6 motorway (Praha – Karlovy Vary) / Nové Strašecí – ŘevničovDesigner
- D6 motorway (Praha – Karlovy Vary) / Krupá relocationDesigner
- D6 motorway (Praha – Karlovy Vary) / Lubenec bypassDesigner
- D6 motorway (Praha – Karlovy Vary) / Lubenec – BošovDesigner
- D6 motorway (Praha – Karlovy Vary) / Knínice – ŽalmanovDesigner
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.