UTI

Romania

Name variants are not merged

Unregistered spelling

Sections
1
Length
2 km
Median slip
+19 mo
Median overrun
–

Slip measured on 1 of 1 sections built.

No section this firm built records both an estimate and a final cost.

Too few sections to rank. The figures below describe the work; they are not a track record.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Joint ventures worked through

  • Somet – TIAB – UTI – Construcții Erbașu

Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.

Sections built

SectionCountryStatusLengthOpenedSlip
Bucharest Metro Line M2 (Pipera – Tudor Arghezi) / Berceni – Tudor ArgheziRomaniaOpened2 kmNov 2023+19 mo

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.