Skip to content
InfraWorldWide
← All contractors

V. Andreev

Romania

Name variants are not merged

Unregistered spelling

Sections
0
Length
0 km
Median slip
–
Median overrun
–

No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Sections built

–

Other roles

Credited to this firm, counted nowhere above.

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.