← All contractors
Zakład Robót Komunikacyjnych DOM w Poznaniu
Poland
- Sections
- 1
- Length
- 28 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Too few sections to rank. The figures below describe the work; they are not a track record.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- PPM-T – Trakcja – ZRK DOM JV
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| Railway line 201 Kościerzyna – Somonino – Gdynia Główna (modernisation, electrification and second track) and Pomorska Kolej Metropolitalna line 248 / Somonino – Gdańsk Osowa (line 201) | Poland | Under construction | 28 km | – | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.