Skip to content
InfraWorldWide
Back to the map

Prague

Czechia

Everything built inside Prague: metro lines, urban bridges and the rest. These projects are shown here rather than on the main map, where at country zoom they would be a few pixels on top of the motorway network.

Population
1,301,432
Mar 2021
GDP per person
€63,500
2023
Opened
0 km
across 1 project
Under construction
4 km
4 sections in total

The city network

Solid lines are open. Dashed lines are building or planned. Zoom in to reach individual stations.

Loading map data…
Click a line on the map to find it in the list below.

Projects

Sources

Population is the capital city of Prague (Praha, municipality code 554782), 1,301,432 usual residents at the 2021 census, reference date 26 March 2021. GDP per capita is for NUTS 3 region CZ010 Hlavní město Praha, which is the same territory as the city: the Czech Statistical Office counts the same 1,301,432 for the region. The two figures are a matched pair. Eurostat flags no 2023 value as provisional.

Czech Statistical Office: Census 2021 results, open data (index of published tables), Czech Statistical Office: Census 2021 open data, sldb2021_pohlavi.csv, "Počet obyvatel s obvyklým pobytem" at 26 March 2021 (Praha: 1,301,432; Hlavní město Praha region: 1,301,432), Eurostat: Gross domestic product (GDP) at current market prices by NUTS 3 region [nama_10r_3gdp], unit EUR_HAB, geo CZ010 Hlavní město Praha, 2023.

Official city site