← All countries
Czechia
as of Oct 2026
- Total open
- 494 km#6 / 7
- Under construction
- 23 km#6 / 6
- Planned
- 41 km
- Projects
- 3
km per 1,000 km²: 6.3#7 / 7km per million people: 45.3#7 / 7
Measured against 78,867 km² and 10,915,839 inhabitants (Jan 2026).
By category
Highways
494 km#6 / 7
building 19 km
planned 35 km
56 sections
Railways
0 km
building 4 km
planned 7 km
4 sections
Network growth
Busiest decade: the 1970s, with 190 km opened.
| km | Highways | |
|---|---|---|
| 1970s | 190 km | 190 km |
| 1980s | 56 km | 56 km |
| 1990s | 25 km | 25 km |
| 2000s | 127 km | 127 km |
| 2010s | 32 km | 32 km |
| 2020s | 64 km | 64 km |
1970
1980
1990
2000
2010
2020
Highways
Mapped sections
Loading map data…
Delivery record
Cost and schedule outcomes for this country's sections, measured exactly as on the performance page.
- Median slip
- −3 mon=1
- On time
- –
- Median overrun
- –n=0
- Sections
- 60
Furthest behind schedule
Delivered on time or early
No section here opened on or before its contract date.
Largest cost overruns
No section here records both an estimate and a final cost.
At or under budget
No section here came in at or under its estimate.
Openings timeline
Past openings
- Aug 21, 2026D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou) / Ostrov – Vysoké Mýto6 km
- Dec 19, 2025D1 motorway (Praha – Brno – Ostrava – Polish border) / Říkovice – Přerov10 km
- Dec 18, 2025D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou) / Janov – Opatovec12 km
- Dec 16, 2025D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou) / Vysoké Mýto – Džbánov6 km
- Nov 20, 2025D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou) / Křelov – Slavonín, stage 23 km
- Dec 22, 2022D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou) / Časy – Ostrov15 km
- Dec 15, 2021D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou) / Opatovice nad Labem – Časy13 km
- Dec 12, 2019D1 motorway (Praha – Brno – Ostrava – Polish border) / Přerov – Lipník nad Bečvou14 km
- Nov 30, 2012D1 motorway (Praha – Brno – Ostrava – Polish border) / Bohumín – Polish border6 km
- Jul 11, 2011D1 motorway (Praha – Brno – Ostrava – Polish border) / Hulín – Říkovice7 km
Scheduled openings
- 2027D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou) / Džbánov – Litomyšl8 km
- 2027D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou) / Litomyšl – Janov10 km
- Jun 2027D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou) / Homole tunnel0.8 km
- 2032Prague Metro Line D (Náměstí Míru – Depo Písnice) / I.D1a Pankrác – Olbrachtova1 km
- 2032Prague Metro Line D (Náměstí Míru – Depo Písnice) / I.D1b Olbrachtova – Nové Dvory3 km
Projects in Czechia
Sources
- CIA World Factbook 2025 (final edition), Czechia, Geography: Area (total 78,867 sq km), via factbook.json
- Eurostat: Population change, demographic balance and crude rates at national level [demo_gind], population on 1 January
Sources for area and population only. Every project cites its own sources on its page.