Belgrade
SerbiaEverything built inside Belgrade: metro lines, urban bridges and the rest. These projects are shown here rather than on the main map, where at country zoom they would be a few pixels on top of the motorway network.
The city network
Solid lines are open. Dashed lines are building or planned. Zoom in to reach individual stations.
Projects
Sources
Population is the City of Belgrade (Grad Beograd) as a whole, 1,681,405 at the 2022 census, reference date 30 September 2022. That is the full administrative area, suburban and rural municipalities included, not only the built-up urban core. GDP per capita is for NUTS 3 region RS110 Beogradska oblast (Belgrade region). Eurostat flags the 2023 value as provisional.
Statistical Office of the Republic of Serbia: 2022 Census of Population, Households and Dwellings, Ethnicity: data by municipalities and cities (City of Belgrade, total: 1,681,405; Republic of Serbia: 6,647,003; population as at 30 September 2022), Eurostat: Gross domestic product (GDP) at current market prices by NUTS 3 region [nama_10r_3gdp], unit EUR_HAB, geo RS110 Beogradska oblast, 2023 (provisional).