Serbia
as of Sep 2026
- Total open
- 404 km#3 / 3
- Under construction
- 13 km#3 / 3
- Planned
- 325 km
- Projects
- 5
km per 1,000 km²: 5.2#3 / 3km per million people: 61.8#3 / 3
Measured against 77,474 km² and 6,532,019 inhabitants (Jan 2026). Excludes Kosovo, as do both sources and the country outline. Serbia's own statistical office reports 88,499 km² including Kosovo and Metohija, and 77,589 km² excluding it; the figures are not interchangeable, so the whole table stays on the excluding-Kosovo basis.
By category
Highways
221 km#3 / 3
building 13 km
11 sections
Railways
183 km#2 / 3
planned 325 km
9 sections
Network growth
Busiest decade: the 2020s, with 283 km opened.
| km | Highways | Railways | |
|---|---|---|---|
| 2010s | 121 km | 121 km | 0 km |
| 2020s | 283 km | 100 km | 183 km |
2010
2020
HighwaysRailways
Mapped sections
Loading map data…
Delivery record
Cost and schedule outcomes for this country's sections, measured exactly as on the performance page.
- Median slip
- +9 mon=1
- On time
- 0%
- Median overrun
- –n=0
- Sections
- 20
Furthest behind schedule
Delivered on time or early
No section here opened on or before its contract date.
Largest cost overruns
No section here records both an estimate and a final cost.
At or under budget
No section here came in at or under its estimate.
Openings timeline
Past openings
- Jun 2026A5 Morava Corridor (Pojate – Preljina) / Adrani – Preljina (E-763 connection)29 km
- Dec 24, 2025A5 Morava Corridor (Pojate – Preljina) / Vrnjačka Banja – Vrba14 km
- Oct 2025Belgrade – Novi Sad – Subotica High-Speed Railway / Novi Sad – Subotica – Kelebija border108 km
- Dec 23, 2024A5 Morava Corridor (Pojate – Preljina) / Koševi – Vrnjačka Banja28 km
- Dec 7, 2023A5 Morava Corridor (Pojate – Preljina) / Kruševac East – Koševi9 km
- Apr 2023A5 Morava Corridor (Pojate – Preljina) / Pojate – Kruševac East20 km
- Mar 2022Belgrade – Novi Sad – Subotica High-Speed Railway / Belgrade Centre – Stara Pazova35 km
- Mar 2022Belgrade – Novi Sad – Subotica High-Speed Railway / Stara Pazova – Novi Sad40 km
- Dec 2019A2 Miloš Veliki Motorway (Belgrade – Preljina) / Surčin – Obrenovac18 km
- 2019A2 Miloš Veliki Motorway (Belgrade – Preljina) / Obrenovac – Ub26 km
Scheduled openings
–
Projects in Serbia
5 projects
- Highways · Serbia
A2 Miloš Veliki Motorway (Belgrade – Preljina)
Opened121 km - Highways · Serbia
A5 Morava Corridor (Pojate – Preljina)
OpenedUnder construction113 km - Railways · Serbia
Belgrade – Novi Sad – Subotica High-Speed Railway
Opened183 km - Railways · Serbia
Corridor X Railway Modernisation (Belgrade – Niš)
PlannedUnder construction229 km - Railways · Serbia
Niš – Dimitrovgrad Railway Modernisation
Under construction96 km
Sources
- CIA World Factbook 2025 (final edition), Serbia, Geography: Area (total 77,474 sq km, Kosovo listed separately at 10,887 sq km), via factbook.json
- Eurostat: Population change, demographic balance and crude rates at national level [demo_gind], population on 1 January
Sources for area and population only. Every project cites its own sources on its page.