Aldesa
Poland
- Sections
- 5
- Length
- 71 km
- Median slip
- +6 mo
- Median overrun
- –
Slip measured on 1 of 5 sections built.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| S17 expressway (Warszawa – Garwolin – Lublin – Zamość – Hrebenne) / Piaski Wschód – Łopiennik | Poland | Tendered | 16 km | – | +6 mo |
| S19 expressway, Via Carpatia (Kuźnica – Białystok – Lublin – Rzeszów – Barwinek) / Lublin Węglin – Niedrzwica Duża | Poland | Opened | 12 km | Dec 2021 | – |
| S19 expressway, Via Carpatia (Kuźnica – Białystok – Lublin – Rzeszów – Barwinek) / Kraśnik bypass | Poland | Opened | 10 km | Dec 2021 | – |
| S19 expressway, Via Carpatia (Kuźnica – Białystok – Lublin – Rzeszów – Barwinek) / Sokołów Małopolski Północ – Stobierna | Poland | Opened | 13 km | Sep 2017 | – |
| S19 expressway, Via Carpatia (Kuźnica – Białystok – Lublin – Rzeszów – Barwinek) / Krosno – Miejsce Piastowe – Dukla | Poland | Opened | 20 km | Dec 2025 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.