Automagistral Pivden

Romania

Name variants are not merged

Unregistered spelling

Sections
2
Length
90 km
Median slip
+20 mo
Median overrun
–

Slip measured on 1 of 2 sections built.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Sections built

SectionCountryStatusLengthOpenedSlip
A11 Arad–Oradea Motorway / DEx16 lot 1: Oradea – SalontaRomaniaTendered34 km–+20 mo
A7 Motorway (Moldavia Motorway) / Suceava – Siret (Ukrainian border)RomaniaTendered56 km––

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.