Bouygues
Croatia
Name variants are not merged
Unregistered spelling
- Sections
- 0
- Length
- 0 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
Too few sections to rank. The figures below describe the work; they are not a track record.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| Istrian Y full-profile upgrade (A8 and A9) / A8 Učka Tunnel – Matulji full profile (second carriageway) | Croatia | Under construction | 11 km | – | – |
| Istrian Y full-profile upgrade (A8 and A9) / A9 Mirna Bridge second carriageway | Croatia | Under construction | 1 km | – | – |
| Istrian Y full-profile upgrade (A8 and A9) / A9 Limska Draga viaduct second carriageway | Croatia | Under construction | 0.6 km | – | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.