Cossi Construzioni
Romania
- Sections
- 2
- Length
- 39 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- Tirrena Scavi – Condotte – Cossi
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A1 Bucharest–Nădlac Motorway / Lugoj – Deva (lot 1) | Romania | Opened | 28 km | Dec 2015 | – |
| A6 Lugoj–Calafat Motorway / Balinț (A1) – Lugoj | Romania | Opened | 11 km | Dec 2013 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.