← All contractors
EGÚT
Hungary
- Sections
- 2
- Length
- 54 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- DEA Konzorcium
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| M3 motorway (Budapest – Gödöllő – Hatvan – Füzesabony – Nyíregyháza – Vásárosnamény – Ukrainian border) / Nyíregyháza bypass (Nyíregyháza-dél – Nagykálló) | Hungary | Opened | 8 km | Aug 2006 | – |
| M5 motorway (Budapest – Kecskemét – Szeged – Röszke) / Kiskunfélegyháza – Szeged-észak | Hungary | Opened | 46 km | Dec 2005 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.