← All contractors
Fabe Polska
Poland
- Sections
- 3
- Length
- 24 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| S17 expressway (Warszawa – Garwolin – Lublin – Zamość – Hrebenne) / Izbica – Zamość Sitaniec | Poland | Tendered | 10 km | – | – |
| S7 expressway (Gdańsk – Elbląg – Warszawa – Radom – Kielce – Kraków – Rabka) / Czosnów – Kiełpin | Poland | Under construction | 9 km | – | – |
| S7 expressway (Gdańsk – Elbląg – Warszawa – Radom – Kielce – Kraków – Rabka) / Miechów – Szczepanowice | Poland | Opened | 5 km | Aug 2024 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.