← All contractors
Habau CZ
Czechia
Name variants are not merged
Unregistered spelling
- Sections
- 2
- Length
- 10 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| D48 motorway (Bělotín – Nový Jičín – Frýdek-Místek – Žukov) / Frýdek-Místek bypass, stage I (Frýdek-Místek-západ – Ostravice) | Czechia | Opened | 4 km | Sep 2022 | – |
| D6 motorway (Praha – Karlovy Vary) / Nové Strašecí – Řevničov | Czechia | Opened | 6 km | Nov 2020 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.