Makyol Insaat Sanayi Turizm ve Ticaret A.S.

Romania

Name variants are not merged

Unregistered spelling

Sections
5
Length
75 km
Median slip
0 mo
Median overrun
–

Slip measured on 3 of 5 sections built.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Joint ventures worked through

  • Alsim Alarko Sanayi Tesisleri ve Ticaret A.S. – Makyol Insaat Sanayi Turizm ve Ticaret A.S.

Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.

Sections built

SectionCountryStatusLengthOpenedSlip
A13 Motorway (Carpathian Motorway) / Lot 1: Boița – Avrig – MârșaRomaniaUnder construction14 km–0 mo
A13 Motorway (Carpathian Motorway) / Lot 2: Mârșa – Arpașu de JosRomaniaUnder construction20 km––
A13 Motorway (Carpathian Motorway) / Lot 3: Arpașu de Jos – Sâmbăta de SusRomaniaUnder construction18 km–+5 mo
A13 Motorway (Carpathian Motorway) / Lot 4: Sâmbăta de Sus – FăgărașRomaniaUnder construction16 km––
Bucharest Metro Line M6 (Gara de Nord – Otopeni Airport) / Phase II: 1 Mai – TokyoRomaniaUnder construction7 km–−11 mo

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.