Marco Obra Publica
Bulgaria
- Sections
- 1
- Length
- 36 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Too few sections to rank. The figures below describe the work; they are not a track record.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- DZZD Evro zhp infrastruktura
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| Plovdiv – Burgas railway rehabilitation, Phase 2 / Orizovo – Mihaylovo (double track, Chirpan tunnel) | Bulgaria | Under construction | 36 km | – | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.