Skip to content
InfraWorldWide
← All contractors

Mosty Łódź

Poland
Sections
4
Length
37 km
Median slip
+28 mo
Median overrun
–

Slip measured on 1 of 4 sections built.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Sections built

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.