Osijek-Koteks
Croatia
- Sections
- 3
- Length
- 34 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A11 Zagreb – Velika Gorica – Lekenik – Sisak / Buševec – Lekenik | Croatia | Opened | 11 km | Apr 2015 | – |
| A5 Slavonika (Hungarian border – Beli Manastir – Osijek – Đakovo – Sredanci – Svilaj) / Halasica bridge – Beli Manastir | Croatia | Opened | 18 km | Dec 2022 | – |
| A5 Slavonika (Hungarian border – Beli Manastir – Osijek – Đakovo – Sredanci – Svilaj) / Beli Manastir – Hungarian border | Croatia | Opened | 5 km | Oct 2025 | – |