Skip to content
InfraWorldWide
← All contractors

Ozaltin Insaat Ticaret VE Sanayi AS

Romania

Name variants are not merged

Unregistered spelling

Sections
1
Length
41 km
Median slip
+3 mo
Median overrun
–

Slip measured on 1 of 1 sections built.

No section this firm built records both an estimate and a final cost.

Too few sections to rank. The figures below describe the work; they are not a track record.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Joint ventures worked through

  • Makyol Insaat Sanayi Turizm VE Ticaret AS – Ozaltin Insaat Ticaret VE Sanayi AS

Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.

Sections built

SectionCountryStatusLengthOpenedSlip
A3 Transylvania Motorway (Brașov–Cluj–Borș) / Nușfalău – Poarta Sălajului (Meseș tunnel)RomaniaTendered41 km–+3 mo
Romanian road tunnels / Meseș tunnel (A3)RomaniaTendered3 km––

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.