Pragoprojekt
Czechia
Name variants are not merged
Unregistered spelling
- Sections
- 0
- Length
- 0 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
–
Other roles
Credited to this firm, counted nowhere above.
- D0 Prague Ring Road (Pražský okruh) / D1 (Modletice) – Vestec (512)Designer
- D0 Prague Ring Road (Pražský okruh) / Vestec – Lahovice (513)Designer
- D0 Prague Ring Road (Pražský okruh) / Třebonice – Řepy (516)Designer
- D0 Prague Ring Road (Pražský okruh) / Ruzyně – Suchdol (518)Designer
- D0 Prague Ring Road (Pražský okruh) / Březiněves – Satalice (520)Designer
- D3 motorway (Praha – Tábor – České Budějovice – Dolní Dvořiště) / Veselí nad Lužnicí – Bošilec (0308C)Designer
- D3 motorway (Praha – Tábor – České Budějovice – Dolní Dvořiště) / Bošilec – Ševětín (0309/I)Designer
- D48 motorway (Bělotín – Nový Jičín – Frýdek-Místek – Žukov) / Bělotín-východ – DubDesigner
- D48 motorway (Bělotín – Nový Jičín – Frýdek-Místek – Žukov) / Palačov – Šenov u Nového JičínaDesigner
- D6 motorway (Praha – Karlovy Vary) / Hořesedly relocationDesigner
- D6 motorway (Praha – Karlovy Vary) / Hořovičky bypassDesigner
- D6 motorway (Praha – Karlovy Vary) / Petrohrad – Lubenec, stage 2Designer
- D6 motorway (Praha – Karlovy Vary) / Petrohrad – Lubenec, stage 1Designer
- D6 motorway (Praha – Karlovy Vary) / Bošov – KníniceDesigner
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.