Precon Transilvania

Romania

Name variants are not merged

Unregistered spelling

Sections
2
Length
62 km
Median slip
+10 mo
Median overrun
–

Slip measured on 2 of 2 sections built.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Joint ventures worked through

  • Precon Transilvania – Citadina 98

Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.

Sections built

SectionCountryStatusLengthOpenedSlip
A11 Arad–Oradea Motorway / DEx16 lot 1: Oradea – SalontaRomaniaTendered34 km–+20 mo
A3 Transylvania Motorway (Brașov–Cluj–Borș) / Biharia – ChiribișRomaniaUnder construction29 km–0 mo

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.