Construcciones Rubau

Serbia
Sections
2
Length
26 km
Median slip
–
Median overrun
–

No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Joint ventures worked through

  • AZVI – Construcciones Rubau JV

Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.

Sections built

SectionCountryStatusLengthOpenedSlip
A1 Niš – Preševo (Corridor X south) / Caričina Dolina – Vladičin HanSerbiaOpened14 kmMay 2019–
A4 Niš – Dimitrovgrad (E80) / Čiflik – StaničenjeSerbiaOpened12 kmJul 2017–