Straco Grup

Romania
Sections
4
Length
129 km
Median slip
–
Median overrun
–

No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.

No section this firm built records both an estimate and a final cost.

Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.

Joint ventures worked through

  • Strabag – Straco
  • Straco Grup – Studio Corona

Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.

Sections built

SectionCountryStatusLengthOpenedSlip
A1 Bucharest–Nădlac Motorway / Orăștie – SibiuRomaniaOpened82 kmNov 2014–
A1 Bucharest–Nădlac Motorway / Simeria – OrăștieRomaniaOpened17 kmMay 2013–
A1 Bucharest–Nădlac Motorway / Deva – SimeriaRomaniaOpened15 kmDec 2012–
A3 Transylvania Motorway (Brașov–Cluj–Borș) / Iernut – UngheniRomaniaOpened14 kmDec 2018–

Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.