← All contractors
Unitef
Hungary
- Sections
- 0
- Length
- 0 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
–
Other roles
Credited to this firm, counted nowhere above.
- M0 Budapest ring road / North sector: M3 – M2Designer
- M0 Budapest ring road / North sector: M2 – Road 2Designer
- M0 Budapest ring road / North sector: Road 2 – Road 11 (Megyeri Bridge)Designer
- M3 motorway (Budapest – Gödöllő – Hatvan – Füzesabony – Nyíregyháza – Vásárosnamény – Ukrainian border) / Görbeháza – Nyíregyháza-délDesigner
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.