← All contractors
Warbud
Poland
- Sections
- 4
- Length
- 77 km
- Median slip
- +27 mo
- Median overrun
- –
Slip measured on 1 of 4 sections built.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A2 motorway (Świecko – Poznań – Łódź – Warszawa – Siedlce – Biała Podlaska – Kukuryki) / Łódź Północ – Skierniewice | Poland | Opened | 32 km | Jun 2012 | – |
| S17 expressway (Warszawa – Garwolin – Lublin – Zamość – Hrebenne) / Warszawa Wschód (Zakręt) – Lubelska | Poland | Opened | 3 km | Dec 2022 | +27 mo |
| S19 expressway, Via Carpatia (Kuźnica – Białystok – Lublin – Rzeszów – Barwinek) / Świlcza – Rzeszów Południe | Poland | Opened | 6 km | Dec 2017 | – |
| S3 expressway (Świnoujście – Szczecin – Zielona Góra – Legnica – Lubawka) / Legnica Południe – Bolków | Poland | Opened | 36 km | Oct 2018 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.