Berger Bohemia
Czechia
- Sections
- 9
- Length
- 68 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- Sdružení D8 0805
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| D48 motorway (Bělotín – Nový Jičín – Frýdek-Místek – Žukov) / Frýdek-Místek bypass, stage I (Frýdek-Místek-západ – Ostravice) | Czechia | Opened | 4 km | Sep 2022 | – |
| D6 motorway (Praha – Karlovy Vary) / Nové Strašecí – Řevničov | Czechia | Opened | 6 km | Nov 2020 | – |
| D6 motorway (Praha – Karlovy Vary) / Hořesedly relocation | Czechia | Opened | 9 km | Sep 2025 | – |
| D6 motorway (Praha – Karlovy Vary) / Hořovičky bypass | Czechia | Opened | 5 km | Sep 2025 | – |
| D6 motorway (Praha – Karlovy Vary) / Petrohrad – Lubenec, stage 2 | Czechia | Under construction | 10 km | – | – |
| D6 motorway (Praha – Karlovy Vary) / Petrohrad – Lubenec, stage 1 | Czechia | Under construction | 2 km | – | – |
| D6 motorway (Praha – Karlovy Vary) / Bošov – Knínice | Czechia | Under construction | 8 km | – | – |
| D6 motorway (Praha – Karlovy Vary) / Knínice – Žalmanov | Czechia | Under construction | 7 km | – | – |
| D8 motorway (Praha – Lovosice – Ústí nad Labem – German border) / Lovosice – Řehlovice (0805, České středohoří) | Czechia | Opened | 16 km | Dec 2016 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.