Società Italiana per Condotte d'Acqua
Romania
- Sections
- 4
- Length
- 87 km
- Median slip
- +20 mo
- Median overrun
- –
Slip measured on 2 of 4 sections built.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- Tirrena Scavi – Condotte
- Tirrena Scavi – Condotte – Cossi
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A1 Bucharest–Nădlac Motorway / Lugoj – Deva (lot 1) | Romania | Opened | 28 km | Dec 2015 | – |
| A1 Bucharest–Nădlac Motorway / Timișoara – Lugoj | Romania | Opened | 35 km | Dec 2015 | – |
| A10 motorway (Sebeș–Turda) / Lot 3: Aiud – Decea | Romania | Opened | 13 km | Jul 2018 | +32 mo |
| A6 Lugoj–Calafat Motorway / Balinț (A1) – Lugoj | Romania | Opened | 11 km | Dec 2013 | +8 mo |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.