EuroAszfalt
Hungary
- Sections
- 3
- Length
- 56 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- EMWL Autópálya Konzorcium
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| M0 Budapest ring road / South sector: Road 51 – M5 (new alignment) | Hungary | Opened | 6 km | Aug 2013 | – |
| M44 expressway (Kecskemét – Kunszentmárton – Békéscsaba) / Kunszentmárton – Csabacsűd | Hungary | Opened | 34 km | Oct 2019 | – |
| M85 expressway (Győr – Csorna – Sopron – Austrian border) / Fertőendréd (Fertőd) – Nagylózs | Hungary | Opened | 16 km | Dec 2020 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.