UVATERV
Hungary
- Sections
- 0
- Length
- 0 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
–
Other roles
Credited to this firm, counted nowhere above.
- M3 motorway (Budapest – Gödöllő – Hatvan – Füzesabony – Nyíregyháza – Vásárosnamény – Ukrainian border) / Nyíregyháza bypass (Nyíregyháza-dél – Nagykálló)Designer
- M35 motorway (Görbeháza – Debrecen – Berettyóújfalu) / Görbeháza (M3) – Debrecen-északDesigner
- M5 motorway (Budapest – Kecskemét – Szeged – Röszke) / Kiskunfélegyháza – Szeged-északDesigner
- M5 motorway (Budapest – Kecskemét – Szeged – Röszke) / Szeged-észak – Röszke (Serbian border)Designer
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.