← All contractors
Doprastav
CzechiaSlovakia
- Sections
- 5
- Length
- 46 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| D1 motorway (Praha – Brno – Ostrava – Polish border) / Říkovice – Přerov | Czechia | Opened | 10 km | Dec 2025 | – |
| D35 motorway (Sedlice – Olomouc – Lipník nad Bečvou) / Janov – Opatovec | Czechia | Opened | 12 km | Dec 2025 | – |
| D1 motorway (Bratislava – Žilina – Poprad – Prešov – Košice – Ukrainian border) / Prešov západ – Prešov juh | Slovakia | Opened | 8 km | Oct 2021 | – |
| D1 motorway (Bratislava – Žilina – Poprad – Prešov – Košice – Ukrainian border) / Privádzač Lietavská Lúčka – Žilina, I. etapa | Slovakia | Under construction | 4 km | – | – |
| D3 motorway (Hričovské Podhradie – Žilina – Čadca – Polish border) / Svrčinovec – Skalité (Svrčinovec and Poľana tunnels, Valy bridge) | Slovakia | Opened | 12 km | Jun 2017 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.