← All contractors
Alpine Bau
GreecePolandRomaniaSerbia
- Sections
- 7
- Length
- 192 km
- Median slip
- –
- Median overrun
- –
No section this firm built records both a contracted duration and a delivery date, so there is no slip to report.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.
Joint ventures worked through
- TERNA – ALPINE J/V
Work done in a joint venture is credited to each member firm, so a venture has no page of its own and never appears beside its members: that would count one section twice.
Sections built
| Section | Country | Status | Length | Opened | Slip |
|---|---|---|---|---|---|
| A7 Moreas Motorway (Corinth – Tripoli – Kalamata) and A71 Lefktro – Sparti / Paradeisia – Tsakona | Greece | Opened | 12 km | Dec 2012 | – |
| A1 motorway (Rusocin – Toruń – Łódź – Częstochowa – Gliwice – Gorzyczki) / Świerklany – Mszana | Poland | Opened | 7 km | May 2014 | – |
| A1 motorway (Rusocin – Toruń – Łódź – Częstochowa – Gliwice – Gorzyczki) / Mszana – Gorzyczki | Poland | Opened | 11 km | Nov 2012 | – |
| A1 Bucharest–Nădlac Motorway / Nădlac – Arad (Hungarian border) | Romania | Opened | 39 km | Jul 2015 | – |
| CFR Line 300 rehabilitation, Rhine–Danube Corridor (Câmpina–Predeal and Coșlariu–Sighișoara) / Coșlariu – Sighișoara | Romania | Opened | 100 km | Jan 2018 | – |
| A4 Niš – Dimitrovgrad (E80) / Pirot istok – Dimitrovgrad | Serbia | Opened | 14 km | Sep 2017 | – |
| A4 Niš – Dimitrovgrad (E80) / Dimitrovgrad bypass | Serbia | Opened | 9 km | Jun 2018 | – |
Firms credited with at least 2 sections, worst median slip first. Measured exactly as on the performance page.