Intercor
Poland
- Sections
- 11
- Length
- 162 km
- Median slip
- +16 mo
- Median overrun
- –
Slip measured on 2 of 11 sections built.
No section this firm built records both an estimate and a final cost.
Only construction counts toward these figures. A design contract is listed on the firm's page and never folded in, because a construction overrun belongs to whoever built the thing.