Croatia
as of Oct 2026
- Total open
- 787 km#4 / 7
- Under construction
- 0 km
- Planned
- 164 km
- Projects
- 8
139 km of this network is track that two lines both list. It is counted once in the totals above, and in full under each line that runs through it, which is how the operators publish it.
km per 1,000 km²: 13.9#2 / 7km per million people: 203.0#2 / 7
Measured against 56,594 km² and 3,876,002 inhabitants (Jan 2026).
By category
Highways
747 km#4 / 7
36 sections
Railways
17 km#5 / 5
planned 164 km
4 sections
Bridges
23 km#1 / 3
4 sections
Network growth
Busiest decade: the 2000s, with 527 km opened.
| km | Highways | Railways | Bridges | |
|---|---|---|---|---|
| 1970s | 39 km | 39 km | 0 km | 0 km |
| 1980s | 33 km | 33 km | 0 km | 0 km |
| 1990s | 55 km | 55 km | 0 km | 0 km |
| 2000s | 527 km | 527 km | 0 km | 0 km |
| 2010s | 68 km | 51 km | 17 km | 0 km |
| 2020s | 65 km | 42 km | 0 km | 23 km |
1970
1980
1990
2000
2010
2020
HighwaysRailwaysBridges
Mapped sections
Loading map data…
Delivery record
Cost and schedule outcomes for this country's sections, measured exactly as on the performance page.
- Median slip
- +39 mon=1
- On time
- –
- Median overrun
- –n=0
- Sections
- 44
Furthest behind schedule
Delivered on time or early
No section here opened on or before its contract date.
Largest cost overruns
No section here records both an estimate and a final cost.
At or under budget
No section here came in at or under its estimate.
Openings timeline
Past openings
- Oct 7, 2025A5 Slavonika (Hungarian border – Beli Manastir – Osijek – Đakovo – Sredanci – Svilaj) / Beli Manastir – Hungarian border5 km
- Oct 22, 2024A11 Zagreb – Velika Gorica – Lekenik – Sisak / Lekenik – Sisak11 km
- Sep 13, 2024Istrian Y full-profile upgrade (A8 and A9) / Učka Tunnel second tube6 km
- Apr 19, 2023Pelješac Bridge and access roads / Ston bypass (Prapratno – Doli)8 km
- Dec 2, 2022A5 Slavonika (Hungarian border – Beli Manastir – Osijek – Đakovo – Sredanci – Svilaj) / Osijek – Halasica bridge7 km
- Dec 2, 2022A5 Slavonika (Hungarian border – Beli Manastir – Osijek – Đakovo – Sredanci – Svilaj) / Halasica bridge – Beli Manastir18 km
- Jul 26, 2022Pelješac Bridge and access roads / Pelješac Bridge (Komarna – Brijesta)2 km
- Jul 26, 2022Pelješac Bridge and access roads / Access roads Duboka – Sparagovići/Zaradeže12 km
- Sep 30, 2021A5 Slavonika (Hungarian border – Beli Manastir – Osijek – Đakovo – Sredanci – Svilaj) / Svilaj interchange – Sava bridge approach2 km
- Sep 30, 2021Svilaj Bridge over the Sava (A5, Croatia – Bosnia and Herzegovina) / Svilaj bridge over the Sava0.7 km
Scheduled openings
- 2026Istrian Y full-profile upgrade (A8 and A9) / A9 Mirna Bridge second carriageway1 km
- 2026Istrian Y full-profile upgrade (A8 and A9) / A9 Limska Draga viaduct second carriageway0.6 km
- Dec 2026Dugo Selo – Križevci – Koprivnica – Hungarian border railway (M201, second track) / Križevci – Koprivnica – state border43 km
- Mar 2027Istrian Y full-profile upgrade (A8 and A9) / A8 Učka Tunnel – Matulji full profile (second carriageway)11 km
Projects in Croatia
9 projects
- Highways · Croatia
A1 Motorway (Zagreb – Ploče)
Opened481 km - Highways · Croatia
A11 Zagreb – Velika Gorica – Lekenik – Sisak
Opened42 km - Highways · Croatia
A5 Slavonika (Hungarian border – Beli Manastir – Osijek – Đakovo – Sredanci – Svilaj)
Opened90 km - Railways · Croatia
Dugo Selo – Križevci – Koprivnica – Hungarian border railway (M201, second track)
Under construction81 km - Railways · Croatia
Dugo Selo – Novska railway second track (M103)
TenderedOpened100 km - Highways · Croatia
Istrian Y (A8 Kanfanar – Matulji, A9 Umag – Pula)
Opened134 km - Highways · Croatia
Istrian Y full-profile upgrade (A8 and A9)
OpenedUnder construction139 km - Bridges · Croatia
Pelješac Bridge and access roads
Opened22 km - Bridges · Croatia
Svilaj Bridge over the Sava (A5, Croatia – Bosnia and Herzegovina)
Opened0.7 km
Sources
- CIA World Factbook 2025 (final edition), Croatia, Geography: Area (total 56,594 sq km), via factbook.json