Romania

as of Oct 2026

Total open
2,006 km#3 / 22
Under construction
1,266 km#1 / 19
Planned
1,213 km
Projects
44

24 km of this network is track that two lines both list. It is counted once in the totals above, and in full under each line that runs through it, which is how the operators publish it.

km per 1,000 km²: 8.4#10 / 22km per million people: 105.4#10 / 22

Measured against 238,391 km² and 19,041,322 inhabitants (Jan 2026).

By category

Highways
1,463 km#3 / 21
building 577 km
planned 965 km
101 sections
Railways
522 km#2 / 16
building 687 km
planned 248 km
50 sections
Bridges
15 km#2 / 5
building 1 km
10 sections
Tunnels
5 km#1 / 5
3 sections

Network growth

Busiest decade: the 2010s, with 978 km opened.

Kilometres opened per decade in Romania, by category
kmHighwaysRailwaysBridgesTunnels
1890s4 km0 km0 km4 km0 km
1900s0 km0 km0 km0 km0 km
1910s0 km0 km0 km0 km0 km
1920s0 km0 km0 km0 km0 km
1930s4 km0 km0 km0 km4 km
1940s0 km0 km0 km0 km0 km
1950s2 km0 km0 km2 km0 km
1960s0 km0 km0 km0 km0 km
1970s105 km96 km9 km0 km0.9 km
1980s69 km17 km49 km3 km0 km
1990s1 km0 km1 km0 km0 km
2000s185 km177 km8 km0 km0.1 km
2010s978 km554 km419 km4 km0 km
2020s657 km619 km36 km2 km0 km
1900
1920
1940
1960
1980
2000
2020
HighwaysRailwaysBridgesTunnels

Mapped sections

Loading map data…

Delivery record

Cost and schedule outcomes for this country's sections, measured exactly as on the performance page.

Openings timeline

Past openings

Scheduled openings

Projects in Romania

44 projects